Rate this post

2025 Latest CTS-I DUMPS Q&As with Explanations Verified & Correct Answers

CTS-I dumps Exam Material with 205 Questions

AVIXA CTS-I Exam Certification Details:

Number of Questions 110
Books / Training Candidate Handbook
Schedule Exam Pearson VUE
Exam Code CTS-I
Passing Score 350 / 500
Sample Questions AVIXA CTS-I Sample Questions

AVIXA CTS-I – Installation Exam Syllabus Topics:

Topic Weight
Duty A: Conducting Pre-Installation Activities 20%
Task 1: Review Audiovisual Project Documentation 4%
Task 2: Conduct Technical Site Survey 4%
Task 3: Prepare for Audiovisual Installation 4%
Task 4: Evaluate Overall Facility Readiness 4%
Task 5: Conduct On-Site Preparations for Installation 4%
Duty B: Conducting Site Rough-In/First-Fix 10%
Task 1: Deinstallation of Existing Equipment and cabling 2%
Task 2: Mount Substructure 4%
Task 3: Pull Cable 4%
Duty C: Installing Audiovisual Systems 38%
Task 1: Assemble AV Rack 4%
Task 2: Wire the AV Equipment Rack 5%
Task 3: Distribute AV Equipment 4%
Task 4: Mount AV Equipment 4%
Task 5: Terminate Cables 5%
Task 6: Configure Network Properties of Equipment 4%
Task 7: Load Configuration and Control Programs 4%
Task 8: Test the AV System 4%
Task 9: Calibrate the AV System 4%
Duty D: Perform Systems Close Out 11%
Task 1: Demonstrate to Client or Client’s Representative that System Performs to Specifications 4%
Task 2:Provide Training on System Operation 4%
Task 3:Obtain Project Completion Sign Off from Client or Client’s Representative 3%
Duty E: Conducting Ongoing Project Responsibilities 21%
Task 1: Complete Progress Reports 3%

 

NO.17 The published design weight of a speaker array with mounting hardware totals 212 pounds (96 kilograms). What minimum weight should the substructure and mounting assembly be able to support?
Response:

 
 
 
 

NO.18 Which of the following must the as-built drawings show?
Response:

 
 
 
 

NO.19 What type of video is best used to verify audio/video synchronization?
Response:

 
 
 
 

NO.20 What is the industry best practice when troubleshooting?
Response:

 
 
 
 

NO.21 What does an elevation flag on a plan drawing indicate?
Response:

 
 
 
 

NO.22 The number of times per second a display will draw the image sent to it is the ___.
Response:

 
 
 
 

NO.23 Which of the following does HDCP 2.0 support?
Select all that apply.
Response:

 
 
 
 

NO.24 Which of these are layer 2 protocols commonly used to transport real-time media over a network?
Select all that apply.
Response:

 
 
 
 

NO.25 A technician is servicing a projector with a problematic RGBHV input. The image has a pink hue. What is the cause for the pink hue?
Response:

 
 
 
 

NO.26 Which test verifies a signal can travel from one end of the cable to the other?
Response:

 
 
 
 

NO.27 Which of the following are elements of a control system?
Select all that apply.
Response:

 
 
 
 

NO.28 What method can a technician use onsite to verify that the AV device is set to the proper IP address?
Response:

 
 
 
 

NO.29 What is a ground loop?
Response:

 
 
 
 

NO.30 When training a customer on the operation of a touch panel interface, an example that the GUI is a good design that meets the customer’s needs:
[Perform Systems Closeout/Provide Training on Equipment Operation]
Response:

 
 
 
 

NO.31 At the end of the project, once installation and verification are complete, acceptance of the completed system is documented in a commissioning report and typically signed by:
Response:

 
 
 
 

NO.32 When a customer adds a newer model display to an existing digital AV system what will impact the system the most and should be reviewed?
Response:

 
 
 
 

NO.33 The following image illustrates:
[Installing AV Systems/Terminate Cables]

Response:

 
 
 
 

NO.34 When powering a system off, which device should you turn off first?
Response:

 
 
 
 

NO.35 If the audio digital signal processor you have to install is discontinued by the manufacturer, what should you do?
(Select all that apply.)
Response:

 
 
 
 

NO.36 Which is the preferred method for keystone error correction?
Response:

 
 
 
 

NO.37 The connector pictured below is known as:

Response:

 
 
 
 

NO.38 Who should attend the construction kick off meeting for a project?
Response:

 
 
 
 

NO.39 Which adjustment on a video wall processor will compensate for the borders between the individual displays?
Response:

 
 
 
 

NO.40 A scope statement should include:
Response:

 
 
 
 

Share Latest CTS-I DUMP Questions and Answers: https://www.surepassexams.com/CTS-I-exam-bootcamp.html

         

Related Links: www.stes.tyc.edu.tw myportal.utt.edu.tt www.stes.tyc.edu.tw myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below