QUESTION 41
Daily reports are important because:
Select All That Apply

 
 
 
 

QUESTION 42
Passivation can best be described as:

 
 
 
 

QUESTION 43
Stripe coats are generally applied to:

 
 
 
 

QUESTION 44
Corrosion generally occurs at which of the following sites:

 
 
 
 

QUESTION 45
When using a sling physchrometer a very large difference between the wet and dry bulb readings indicates:

 
 
 
 

QUESTION 46
Prior to using Inspection Tools the inspector must:

 
 
 
 

QUESTION 47
Removal of surface contaminants is done by:

 
 
 
 

QUESTION 48
Inspector’s daily reports are used:
Select All That Apply

 
 
 
 

QUESTION 49
An exposed area of the substrate or previous coat of a conductive coating material, often caused by poor application technique is called

 
 
 
 

QUESTION 50
If the specifier does not identify a restriction level in accordance with SSPC PA 2, the default restriction level is:

 
 
 
 

QUESTION 51
An inspectors personal log book should contain:

 
 
 
 

QUESTION 52
As a NACE Coating Inspector your responsibility with respect to safety is to:

 
 
 
 

QUESTION 53
You are asked to be the only coating inspector on a small bridge recoating job where existing coating contains lead. The owners’ representative has supplied you with the local code governing the removal and disposal of lead based coatings, however upon reading the document you having great deal of difficulty understanding the technical language.
As a NACE CIP Level 1 Inspector your preferred course of action is to:

 
 
 
 

QUESTION 54
When holiday testing is required the Inspector is always required to enforce NACE SP 0188:

 
 

QUESTION 55
Most industrial coatings are:

 
 
 
 

QUESTION 56
When performing tests for oil and grease using an ultra-violet light, the NACE Inspector should be aware that:

 
 
 
 

QUESTION 57
The most important factor resulting in improved job site safety is:

 
 
 
 

QUESTION 58
The initial steel condition is important to the NACE Inspector because:

 
 
 
 

QUESTION 59
You are the NACE Inspector on a job where ISO ST 3 has been specified. The Contractor normally works to SSPC standards and been referencing SSPC SP 3.
Could this have any impact on the final surface preparation appearance?

 
 
 
 

QUESTION 60
Due to a previous premature coating failure the owner has required the original coating applicator to return to remove and replace 10,000 square feet of a failed three coat system at the applicator’s cost. Due to the financial implications of another failure, the owner has offered you the job as the NACE CIP Level 1 Coating Inspector and explained that he expects you to be his “insurance policy” for this job. You have never been involved in a warranty job before and are unfamiliar with the coating system.
Your preferred FIRST course of action is to:

 
 
 
 

QUESTION 61
Which is a component that supplies most of the features and functions of the material?

 
 
 
 

QUESTION 62
Upon arrival of coating materials, the inspector should

 
 
 
 

QUESTION 63
Using SSPC Vis 1 as a guide when performing a visual inspection of a steel surface prior to surface preparation a NACE Inspector would assign which designations to the surface condition:

 
 
 
 

QUESTION 64
It is good practice for the NACE Inspector to have instrument calibration certificates available:

 
 
 
 

QUESTION 65
Which of these tests uses a syringe?

 
 
 
 

Updated Official licence for NACE-CIP1-001 Certified by NACE-CIP1-001 Dumps PDF: https://www.surepassexams.com/NACE-CIP1-001-exam-bootcamp.html

         

Related Links: www.stes.tyc.edu.tw myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt www.stes.tyc.edu.tw

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below