4.3/5 - (3 votes)

[Jan-2023] HQT-4180 Questions – Truly Beneficial For Your Hitachi Exam

Download Hitachi HQT-4180 Sample Questions

QUESTION 10
Which two reconfiguration activities are performed without interrupting host access on a VSP Gx00 system? (Choose two.) Choose 2 answers

 
 
 
 

QUESTION 11
You need to replace a broken fan in a VSP E1090.
What is the correct procedure?

 
 
 
 

QUESTION 12
One Unix server and one Windows server share the front-end ports CL1-A and CL2-A of a VSP E590 system.
What are two requirements to separate the I/Os of the servers? (Choose two.)

 
 
 
 

QUESTION 13
You have to perform a firmware update containing new code for DKCMain, CHBs and drives on a VSP G900.
What are two requirements? (Choose two.)

 
 
 
 

QUESTION 14
Which program is used to perform the “New Installation” procedure on a VSP midrange system?

 
 
 
 

QUESTION 15
Which program is used to perform the “New Installation” procedure on a VSP F700 system?

 
 
 
 

QUESTION 16
A customer wants to upgrade a VSP G700 to 512 GB RAM capacity.
What is the valid CFM configuration?

 
 
 
 

QUESTION 17
You need to replace a broken disk drive on a VSP G700.
What are two prerequisites? (Choose two.)

 
 
 
 

QUESTION 18
What is the maximum size of a basic volume carved out from an internal parity group on a VSP E590 system?

 
 
 
 

QUESTION 19
A customer wants to change a production RAID Group from RAID 5 (7D+1P) to RAID 6 (6D + 2P) on a VSP G700 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?

 
 
 
 

QUESTION 20
What are two consequences when a “New Installation” procedure is performed on a VSP Midrange system? (Choose two.)

 
 
 
 

QUESTION 21
Which two actions can be performed with Hitachi Ops Center Administrator? (Choose two.)

 
 
 
 

QUESTION 22
You need to replace a failing power supply (PS) in a VSP E590.
What is the correct procedure?

 
 
 
 

QUESTION 23
Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.
What should you do next?

 
 
 
 

Truly Beneficial For Your Hitachi Exam: https://www.surepassexams.com/HQT-4180-exam-bootcamp.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below